19 November 2010

The World of Tomorrow: Basic Math

Muskrat Falls:  824 megawatts with an estimated capital cost of $6.2 billion.  That works out to about $7.5 million per installed megawatt.

La Romaine:  1,550 megawatts for $6.5 billion.  That works out to $4.1 million per installed megawatt.

- srbp -